Back to corpus
technical noteexperiment writeup candidatescore 28

LUME Creative Engine Maturation — Divergent Rail Plan

- Total phases: **5** (Phase 0 setup + Phase 1-4 reel/push/stabilize) - Total tracks: **22** (Σ across phases; mean ≈ 4.4 / phase, peak 5 in Phase 1+2) - Machines: **Mac1** (dev/CAD/spawn), **Mac4** (Unity host + Mac mini sled prototype), **Mac5** (ML, rate-limited; SAN inference only), **K11** (production publisher pod), **iPhone** (MotionMixApp capture + LUMF/LUMM source), **iPad** (LUMM fallback) - Wall time: **7 days** (phases sequential by gate; tracks parallel within phase) - Invariant config: `epsilon = 0.01

Full HTML reader

Read the full artifact

Open in new tab

Extracted abstract or opening context

# LUME Creative Engine Maturation — Divergent Rail Plan > Stage 4 of `/chain:genesis`. EW-governed. 7-day reel-ship + non-blocking parallel work. > Inputs: `stage3-expand-master-plan.md` (5-pane plan), `creative-forge-output.md` (Q1 audio threading + Q2 director schema sub-rail + Q3 USB-dominant CAD). > Output binding: this file is what each Codex pane reads to know its role and its bounds. > Deadline: Reel-001 posted 2026-05-09 EOD. Wave 8 push lands the same day. - Total phases: **5** (Phase 0 setup + Phase 1-4 reel/push/stabilize) - Total tracks: **22** (Σ across phases; mean ≈ 4.4 / phase, peak 5 in Phase 1+2) - Machines: **Mac1** (dev/CAD/spawn), **Mac4** (Unity host + Mac mini sled prototype), **Mac5** (ML, rate-limited; SAN inference only), **K11** (production publisher pod), **iPhone** (MotionMixApp capture + LUMF/LUMM source), **iPad** (LUMM fallback) - Wall time: **7 days** (phases sequential by gate; tracks parallel within phase) - Invariant config: `epsilon = 0.01 deliverables/hour`, `max_div = 4` (Phase 0 hits 5 — flagged in Risk Register), `stall_threshold = 2 sessions with no track-level commit`, `min_viable_transitions = 2 next-step branches per gate` - Agents: 5 Codex panes (P1-P5) + Claude (Mac1 Sonnet 4.7 1M, this session) + Mohamed (judgment + destructive ops + photoshoot) - Repos in scope: `lume-commerce` (software/demo, hardware/cad, launchagents), `MotionMixApp` (iOS Swift), `MotionMix` (macOS director + REEL-001 plan), `MotionMixDirector` (Swift Package — director schema target), `multicam-server` (Rust — director Rust impl deferred to Wave 9) ## Phase 0: Setup (Day 0 = 2026-05-02 evening) > **Gate**: 5 Codex pane prompts in `evo-cube-output/`, K11 health-check green, Mac4 reachable via Tailscale, FirstDate PAT rotation **status confirmed** (rotated OR sentinel `WAVE8_PUSH_BLOCKED_PAT_ROTATION` written), `[home-path]` directory created with empty per-pane files, pre-commit hook target paths surveyed. > **EW Check**: **Bounded Divergence at risk** — 5 panes brushes the cap of 4 + 1 critical. Resolved by collapsing the "Mac4 verifier handoff prompt" sub-track into the P3 pane prompt (P3 owns Mac4 anyway), and treating "K11 health check" as a 10-minute gate ritual (not a parallel track at this phase). > **Min viable transitions**: 2 (→ Phase 1 if all panes online; → Phase 0.5 stall-recovery if K11 unreachable for >30min) | Track | Task | Machine | Blocks | EW Role | Effort | |-------|------|---------|--------|---------|--------| | Critical | Open 5 Codex panes with paste-ready prompts (one prompt per pane), set `feature/wave9-creative-engine` branch on `MotionMixApp` repo, set `chore/wave8-push-readiness` branch on `lume-commerce` | Mac1 | All phases | Rail spine | 60 min | | A | FirstDate PAT rotation — `git -C Desktop/FirstD

Promotion decision

What has to happen next

Attach run IDs, datasets, metrics, and reproduction commands.

Why this is not always a full paper yet

Corpus pages are public-safe readers for discovered workspace artifacts. They are not automatically final papers. A corpus item becomes a polished paper only after the editable source, evidence checkpoints, references, figures, render path, and release status are attached through the paper schema.