Echelon Project To-Do List
- ✅ Phase 1: Audio Engine (100%) - ✅ Phase 2: Scheduler & Safety (100%) - ✅ Phase 3 Week 13: Motion Stream Integration (100%) - ✅ Phase 3 Week 14: Voice Control Structure (90%) - ✅ Phase 3 Week 15: Phrase Intelligence Service (95%) - ✅ Phase 3 Week 16: UI Foundation (100%) - ✅ Phase 3 Week 17: Phrase Browser & Automation (100%) - ✅ Phase 3 Week 18: Initial Integration Structure (60%)
Full Public Reader
Echelon Project To-Do List
Last Updated: December 2024
Status: Phase 3 Week 18 - Integration & Beta Review
---
🔴 Critical (Must Complete for Beta)
### 1. Scheduler Intent Processing
- [ ] Process intents_in in scheduler_thread
- File: `apps/studio/src/threads/scheduler_thread.rs`
- Current: `intents_in` is received but not processed
- Action:
- Create a loop to process `intents_in` queue
- Call `scheduler.submit_intent(intent)` for each intent
- Handle errors gracefully
- Estimated Time: 30 minutes
- Priority: 🔴 Critical
### 2. Motion → Phrase Intelligence Connection
- [ ] Connect motion thread to phrase intelligence service
- File: `apps/studio/src/threads/motion_thread.rs` (line 61)
- Current: `RecommendationContext` is created but not used
- Action:
- Create a channel or shared state for recommendation requests
- Send `RecommendationContext` to phrase intelligence service
- Receive recommendations and display in UI
- Estimated Time: 1-2 hours
- Priority: 🔴 Critical
### 3. Full Thread Integration
- [ ] Initialize and connect motion/voice/phrase intelligence in main.rs
- File: `apps/studio/src/main.rs`
- Current: Components are stubbed, threads not fully connected
- Action:
- Initialize `DellMotionReceiver` and `MotionTranslator`
- Initialize `VoiceRecognizer` and `VoiceCommandParser`
- Initialize `PhraseDatabase`, `PhraseRecommender`, `RecommendationService`
- Pass to respective threads
- Create action queue producer for motion/voice threads
- Estimated Time: 2-3 hours
- Priority: 🔴 Critical
---
🟡 High Priority (Beta Demo)
### 4. Voice Recognition Integration
- [ ] Integrate whisper-rs for actual voice recognition
- File: `crates/voice-control/src/recognizer.rs`
- Current: Stub implementation returns `None`
- Action:
- Add `whisper-rs` dependency (or alternative)
- Load Whisper model
- Convert f32 audio to i16 format
- Run inference
- Extract transcript and confidence
- Blocked On: Whisper model files
- Estimated Time: 4-6 hours (after model files)
- Priority: 🟡 High
### 5. Episode 1 API Connection
- [ ] Connect to real Episode 1 API endpoint
- File: `crates/motion-bridge/src/receiver.rs`
- Current: Ready but needs API endpoint URL
- Action:
- Configure API endpoint in `MotionReceiverConfig`
- Test with real Episode 1 data
- Handle authentication if needed
- Blocked On: Episode 1 API endpoint URL
- Estimated Time: 1-2 hours (after API available)
- Priority: 🟡 High
### 6. Performance Optimization
- [ ] Profile and optimize critical paths
- Areas:
- UI rendering (target: 60 FPS)
- Phrase recommendation latency (target: <5 ms)
- Motion/voice processing overhead
- Audio callback performance
- Action:
- Use `cargo flamegraph` or `perf` for profiling
- Identify bottlenecks
- Optimize hot paths
- Add performance telemetry
- Estimated Time: 4-6 hours
- Priority: 🟡 High
### 7. Beta Demo Preparation
- [ ] Create beta demo executable and video
- Action:
- Create `examples/beta_demo.rs` showcasing all features
- Record 5-minute demo video
- Document demo script
- Test all features work end-to-end
- Estimated Time: 1 day
- Priority: 🟡 High
---
🟢 Medium Priority (Post-Beta)
### 8. FAISS Integration (Optional)
- [ ] Replace linear search with FAISS for phrase similarity
- File: `crates/phrase-intelligence/src/database.rs`
- Current: Using linear search (works but slower)
- Action:
- Evaluate `faiss-rs` or `hnsw_rs` crates
- Integrate FAISS index
- Maintain backward compatibility
- Estimated Time: 2-3 hours
- Priority: 🟢 Medium (linear search is acceptable)
### 9. Link SDK Integration
- [ ] Complete Ableton Link SDK integration
- File: `crates/link-clock/src/link_clock.rs`
- Current: FFI infrastructure ready, needs SDK
- Action:
- Obtain Ableton Link SDK license
- Complete FFI bindings
- Test Link synchronization
- Blocked On: Ableton Link SDK license
- Estimated Time: 4-6 hours (after SDK)
- Priority: 🟢 Medium (LocalBeatClock works)
### 10. Error Handling & Recovery
- [ ] Add comprehensive error handling
- Areas:
- Audio engine errors
- Scheduler errors
- Motion/voice thread errors
- UI errors
- Action:
- Define error types
- Implement recovery strategies
- Add error telemetry
- Estimated Time: 4-6 hours
- Priority: 🟢 Medium
### 11. Integration Tests
- [ ] Create end-to-end integration tests
- Action:
- Test motion → action pipeline
- Test voice → action pipeline
- Test phrase recommendation → deck load
- Test UI → engine communication
- Estimated Time: 4-6 hours
- Priority: 🟢 Medium
---
🔵 Low Priority (Nice to Have)
### 12. Documentation
- [ ] Update phase documentation
- Files: `docs/phase/phase-3.md`, `docs/phase/phase-3-plan.md`
- Action:
- Update with completed tasks
- Add setup instructions
- Add usage examples
- Document known limitations
- Estimated Time: 2-3 hours
- Priority: 🔵 Low
### 13. Code Quality
- [ ] Clean up TODOs and stubs
- Action:
- Remove or implement stub code
- Clean up unused imports
- Add missing documentation
- Estimated Time: 2-3 hours
- Priority: 🔵 Low
### 14. UI Enhancements
- [ ] Polish UI components
- Action:
- Improve visual design
- Add animations
- Improve responsiveness
- Estimated Time: 4-6 hours
- Priority: 🔵 Low
---
📋 Quick Reference
### Files with TODOs
- `apps/studio/src/threads/scheduler_thread.rs` - Process intents_in
- `apps/studio/src/threads/motion_thread.rs` - Connect to phrase intelligence
- `crates/voice-control/src/recognizer.rs` - Integrate whisper-rs
- `crates/voice-control/src/feedback.rs` - Implement TTS/audio feedback
- `crates/phrase-intelligence/src/database.rs` - Add FAISS support
- `crates/ui-shell/src/deck_lane.rs` - Get gain from state
### External Dependencies
- Whisper Model Files - For voice recognition
- Episode 1 API Endpoint - For motion data
- Ableton Link SDK - Optional, for Link sync
### Estimated Time to Beta
- Critical Tasks: ~4-6 hours
- High Priority: ~1-2 days
- Total to Beta: ~2-3 days of focused work
---
✅ Recently Completed
- ✅ Phase 1: Audio Engine (100
- ✅ Phase 2: Scheduler & Safety (100
- ✅ Phase 3 Week 13: Motion Stream Integration (100
- ✅ Phase 3 Week 14: Voice Control Structure (90
- ✅ Phase 3 Week 15: Phrase Intelligence Service (95
- ✅ Phase 3 Week 16: UI Foundation (100
- ✅ Phase 3 Week 17: Phrase Browser & Automation (100
- ✅ Phase 3 Week 18: Initial Integration Structure (60
---
Next Session Focus: Complete critical tasks 1-3 (scheduler intents, motion→phrase connection, full integration)**
Promotion Decision
Attach run IDs, datasets, metrics, and reproduction commands.
Source Anchor
projects/Documentation/02-projects/echelon/todo.md
Detected Structure
Method · Evaluation · Figures · Code Anchors · Architecture